South Broadway Corridor Plan Survey Results

From the South Broadway Corridor Plan website

COMMUNITY SURVEY
CORRIDOR ISSUES AND OPTIONS
Survey Results
A keypad polling exercise on Corridor Issues and Options was conducted during Public Meeting #1 on June 28, 2011 with 47 participants. The poll was converted to an online survey using Survey Monkey. The survey link was posted on the project Facebook page and Twitter messages. The survey closed on July 29, 2011 with 81 respondents. A combined total of 128 responses were submitted.
Summary of Key Survey Responses Majority of respondents were Haysville residents, with over 1/3 being S. Broadway property owners. Majority perception that S. Broadway is a regional commuter route that is the first impression most visitors have of Haysville. Strong support for addition of a continuous center left turn lane. Strong support for improved pedestrian accommodations, with 2/3 supporting a multi-use path to also enhance bicycling. Mixed land uses are preferred with a strong majority (56%) in favor of special mixed use zoning. Community prefers that future major commercial development be focused around arterial intersections. Over 80% believe the quality of existing S. Broadway development presents a negative image of Haysville. Strong support for architectural and landscaping standards to improve the appearance of S. Broadway, including among property owners.
The full set of compiled survey responses begins on the next page. The results include those for the key pad poll, the online survey and combined totals.

See the full survey results here.

Leave a Reply

Your email address will not be published. Required fields are marked *

Time limit is exhausted. Please reload CAPTCHA.